iTrans.ir
سفارش ترجمه
خانه
راهنما
چگونه سفارش ترجمه دهیم
تماس با ما
ترجمه فوری
راهنمای استفاده از سایت
API
بیشتر...
پرسش و پاسخ
قیمت ترجمه
ثبت نام
ورود
021-66989400
021-66989500
0935-173-0404
نشانی و اطلاعات تماس
تگ Acceptance
جزئیات خدمات ترجمه در ترجمه تخصصی
mobile
Components
Components
sumer context. Then, we discuss the new constructs added to
110 4 Generalized Linear Models
110 4 Generalized Linear Models
CA 95616 Abstract The effect of two fruit maturity stages
Computers in Human Behavior 35 (2014) 464–478
IEEETRANSACTIONSON VOL. NO. AUGUST 1979 227
includes the collection and presentation of relevant information that reflects
includes the collection and presentation of relevant information that reflects
Studies of parental attitudes toward BGT present different methods to
) یطابنتسا رامآStatistical
ISSN 0214 - 9915 CODEN PSOTEG
ISSN 0214 - 9915 CODEN PSOTEG
The Employer and the Contractor are also referred to as
The Employer and the Contractor are also referred to as
Asia Pacific Management Review xxx (2015) 1e11
Asia Pacific Management Review xxx (2015) 1e11
RESEARCH
International Conference on Computer Applications in Shipbuilding, 2013, Busan, Korea
Journal of Business Research 66 (2013) 2536–2544
Journal of Hospitality and Tourism Technology
Journal of Retailing and Consumer Services 40 (2018) 8–18
پذیرش لحظه حال
and examples of these criteria will be discussed in the
and examples of these criteria will be discussed in the
4 ECONOMIC RISK AND PERFORMANCE ACCEPTANCE CRITERIA Risk acceptance criteria
This could include use or the risk of early fatalities
term exposure risk concerns is the development Of a criterion
the total risk in terms Of the of the maintenance
ACT therapy