iTrans.ir
سفارش ترجمه
خانه
راهنما
چگونه سفارش ترجمه دهیم
تماس با ما
ترجمه فوری
راهنمای استفاده از سایت
API
بیشتر...
پرسش و پاسخ
قیمت ترجمه
ثبت نام
ورود
021-66989400
021-66989500
0935-173-0404
نشانی و اطلاعات تماس
تگ CONTRACTOR
جزئیات خدمات ترجمه در ترجمه تخصصی
11 Assembling the parts
11 Assembling the parts
11 Assembling the parts
umbrella company
SARVAK AZAR ENGINEERING AND DEVElOPMENT COMPANY
SARVAK AZAR ENGINEERING AND DEVElOPMENT COMPANY
SARVAK AZAR ENGINEERING AND DEVElOPMENT COMPANY
SARVAK AZAR ENGINEERING AND DEVELOPMENT Co.
SARVAK AZAR ENGINEERING AND DEVELOPMENT Co.
304 11 Project Cost System
January 27, 2015 8(1)
Contract regardingthe supply of a waste conversion installation between
Brigham Young University
APPENDIX A. CM/GC EXPERIENCED CONTRACTOR SURVEY
World Applied Sciences Journal 24 (4): 540-549, 2013
Study on Construction Claim for International Project Based on Contract
contractor, but one can see that he isn't used to buildings of
CHAPTER 3
CHAPTER 3
CHAPTER 3
INSURANCE REQUIREMENTS
INSURANCE REQUIREMENTS
INSURANCE REQUIREMENTS
INSURANCE REQUIREMENTS
INSURANCE REQUIREMENTS
If it is impossible within the stipulated period of this
Expert Systems with Applications 42 (2015) 5087–5101
The Employer and the Contractor are also referred to as
The Employer and the Contractor are also referred to as
Global Claims in Construction Ali D. Haidar
Definition The context in which the term global claim is
prohect cost management
PRELIMINARY AGREEMENT
This article was downloaded by: [Eindhoven Technical University]
EPC TemplateThis EPC contract contemplates that a single contractor
Amanda M. Girth
CONTRACT OF SALE between Bergen Engines AS (BEAS) (hereinafter called the CONTRACTOR) and (hereinafter called the PURCHASER)
Downloaded from Ketab.io, Sponsor: TBS.ir
Project MC: Owner:
Specifications:
Journal of Civil Engineering and Management
Journal of Civil Engineering and Management
3.2 Sponsor
figure 6. Financial risk will be at the top in a system
Journal of Civil Engineering and Management
Project MC:
Project MC:
The Place and the Time of the Contract Tbilisi September
Service specification
02 MaterialsMaterials used for tunnel engineering should conform to
02 MaterialsMaterials used for tunnel engineering should conform to
Guidelines for
Service specification
i
and in the absence of such a contract with at
and in the absence of such a contract with at
a company incorporated under the laws of the Islamic Republic
The Contractor shall provide furnishing services in accordance with the
The Contractor shall provide furnishing services in accordance with the
The Contractor shall provide furnishing services in accordance with the
The Contractor shall provide furnishing services in accordance with the
The Contractor shall provide furnishing services in accordance with the
The Contractor shall provide furnishing services in accordance with the
The Contractor shall provide furnishing services in accordance with the
The Contractor shall provide furnishing services in accordance with the
What is Early Contractor Involvement (ECI) and how does it work?
How To Choose the Best Refractory Material We commonly hear
EPIC FOR COMMONCOOLING WATER SYSTEM (CCWS) PHASE -IV FOR NFS EXPANSION PROJECT