iTrans.ir
سفارش ترجمه
خانه
راهنما
چگونه سفارش ترجمه دهیم
تماس با ما
ترجمه فوری
راهنمای استفاده از سایت
API
بیشتر...
پرسش و پاسخ
قیمت ترجمه
ثبت نام
ورود
021-66989400
021-66989500
0935-173-0404
نشانی و اطلاعات تماس
تگ Lining
جزئیات خدمات ترجمه در ترجمه تخصصی
Subsidence owing to tunnelling. I. Estimating the gap parameter
component EP resin soaked liner hose is wound in a
component EP resin soaked liner hose is wound in a
Subsidence owing to tunnelling. I. Estimating the gap parameter
ROADSIDE DITCH DESIGN AND EROSION CONTROL
is based on the spiral lining process discussed in Chapter
is based on the spiral lining process discussed in Chapter
is based on the spiral lining process discussed in Chapter
Welding onventilation and venting nozzles and welding the annuar space
Depiction of the connection of GRP segments with H profiles
Tunnelling and Underground Space Technology 25 (2010) 543–552
Selecting
Designation: D7602 − 11
Linings of Aboveground Petroleum
By Authority Of
02 MaterialsMaterials used for tunnel engineering should conform to
02 MaterialsMaterials used for tunnel engineering should conform to
efractory engineers are constantly under pressure to ensure improved reliability