iTrans.ir
سفارش ترجمه
خانه
راهنما
چگونه سفارش ترجمه دهیم
تماس با ما
ترجمه فوری
راهنمای استفاده از سایت
API
بیشتر...
پرسش و پاسخ
قیمت ترجمه
ثبت نام
ورود
021-66989400
021-66989500
0935-173-0404
نشانی و اطلاعات تماس
تگ construction
جزئیات خدمات ترجمه در ترجمه تخصصی
system
work
construction
planning
model
model
model
construction
model
model
model
model
model
model
model
stadium
buildings
LEED
engineering
engineering
engineering
decision
Hickory
STUDY REPORT
STUDY REPORT
Automation in Construction 31 (2013) 65–74
Expert Systems with Applications 29 (2005) 723–734
Design and construction of NATM underground station tunnel by using
Sustainability 2014, 6, 416-435; doi:10.3390/su6010416
Waste Management 32 (2012) 521–531
The current issue and full text archive of this journal is available at
The current issue and full text archive of this journal is available at
Bachelor of Architectural Technology and
operative supply chain where companies can work with customers and
Steel Design Guide Series
Advances in Engineering Software 71 (2014) 34–45
PART3
PART1 - خ - ع
S SAFETY OF DAMS PROGRAM This guide provides general information
Improved SWOT Approach for Conducting Strategic
Non-Metallic Materials 159
A suspension bridge is a type of bridge in which
Structural behavior The main forces in a suspension bridge of
مدیریت ریسک
مدیریت ریسک
CHAPTER14
Planning and
Planning and
Planning and
Structural analysis The main forces in a suspension bridge of
Modular Prefabricated
the inspection including evaluation of the condition of the sewer
the inspection including evaluation of the condition of the sewer
the inspection including evaluation of the condition of the sewer
although even the most heavily alloyed wrought aluminium is still
1
incorporates by reference the standards of the International Chamber of
incorporates by reference the standards of the International Chamber of
incorporates by reference the standards of the International Chamber of
incorporates by reference the standards of the International Chamber of
Designing Domain-Specific Processors
Thin-Walled Structures 83 (2014) 182–189
Evaluation of change management efficiency of construction contractorsIn construction
10 meter span culverts in accordance with standards of Journal
Operational phasePotential impacts to knowledge and expertise during the
and Market distortion As previously noted local law requires that
Include a baseline survey of existing road conditions and mechanisms
J. Mod. Transport. (2013) 21(4):258–265
ARTICLE IN PRESS
THE USE OF POLYMER COMPOSITES IN
AutomationinConstruction48(2014)64–73
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
Sustainable low impact demonstration projects
Renewable Energy 34 (2009) 2067–2073
JZhou et al—A review of methods and algorithms 1097
Critical Factors Determining Bid/No Bid
Empirical Framework for Making the Bid/No-Bid Decision
Critical Factors Determining Bid/No Bid
Empirical Framework for Making the Bid/No-Bid Decision
Empirical Framework for Making the Bid/No-Bid Decision
23 Innovation in Bridge Design and Construction: Composite Box Girder Bridge
construction guides and circles can be a very powerful technique
Use of a Production Function to Estimate the Impact
Studies research and development of wind power because of the
InternationalJournalofProjectManagement20(2002)253–262
InternationalJournalofProjectManagement20(2002)253–262
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
The construction industry is often considered as a risky business
The construction industry is often consideredas a risky business due
The construction industry is often consideredas a risky business due
The construction industry is often consideredas a risky business due
Washington the new Bastyr University Student Village accommodates 132 students
�
PROJECT RISK IDENTIFICATION METHODS FOR CONSTRUCTION
International Journal of Steel Structures
Available online at www.sciencedirect.com
Firstly, I would like to thank you for being one of valuable customers and we do really appreciate your patience.
304 11 Project Cost System
Available online at www.sciencedirect.com
We take this opportunity to announce that the construction work of our project THE LIVING LEGENDS is accelerated and work is going ahead rapidly.
DK037X_half-series-title 3/17/06 11:30 AM Page 1
Automation in Construction 35 (2013) 238–253
HOS TED BY Available online at www.sciencedirect.com
Drainage is the natural or artificial removal of surface and
Steelbridge 2004
Recent years have witnessed a significant amount of construction waste
Reports
Reports
Reports
Reports
ژئوتکنیک ( ماشینهای حفاری تونل TBM )
a great deal of emphasis has been placed on the
6/6/2015 How-do-home-construction-loans-work-.html
Civil engineering is a professional engineering discipline that deals with the design, construction, and
UFC 4.020.01
Automation in Construction 19 (2010) 134–141
2011Academic Journals Full Length Research Paper Construction planning supported in
FEBRUARY 2014 NUMBER 290 TR NEWS ABCs of Bridge Renewal
Life cycle assessment of wood-based
Contract regardingthe supply of a waste conversion installation between
Automation in Construction 22 (2012) 223–232
ApisCor circular mobile 3D printer can 3D print houses and
Hindawi Publishing Corporation
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
Brigham Young University
Poisson Model of Construction Incident Occurrence
Technical Note
There are many elements to the manufacture and preassembly of
Risk Assessment of Work-Related Musculoskeletal
Risk Assessment of Work-Related Musculoskeletal
a product with high recycled content and which is itself
Proceedings Proceedings of of the the World World Multiconference Multiconference on on APPLIED APPLIED ECONOMICS, ECONOMICS, BUSINESS BUSINESS AND AND DEVELOPMENT DEVELOPMENT (AEBD (AEBD '09) '09)
Automation in Construction 25 (2012) 82–93
IS success model Construction Structural equation model Among various IT
Technical Memorandum
Sewer network operating costs with reference to the number of
Safety Science 71 (2015) 275–281
THE E-ELT
Safety and Health at Work 6 (2015) 200e205
ﺖﺧﺎﺳ شور و ﺖﯾﺮﯾﺪﻣ
Automation in Construction 25 (2012) 82–93
Conceptualizing Safety Management in
Conceptualizing Safety Management in
Conceptualizing Safety Management in
Introduction and remote-sensing methods have been proposed to collect human
Introduction and remote-sensing methods have been proposed to collect human
Introduction and remote-sensing methods have been proposed to collect human
Environmental and Social
Automation in Construction 32 (2013) 62–79
Automation in Construction 32 (2013) 62–79
Automation in Construction 32 (2013) 62–79
AUTCON-01947;NoofPages9
AUTCON-01947;NoofPages9
JournalofConstructionalSteelResearch62(2006)1192–1198
Seismic behaviors of steel plate shear wall structures with construction
Seismic behaviors of steel plate shear wall structures with construction
Considerations on recent trends in, and future prospects of, steel
Automation in Construction 19 (2010) 235–244
it is observed that the construction of long and big
1 INTRODUCTION
ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING
Neural Network Modeling of Highway Construction Costs
Retaining structures
CONTINUING EDUCATION
CONTINUING EDUCATION
Automation in Construction 25 (2012) 82–93
Establishing a success model of a specific information system is
success is widely accepted for the evaluation of information systems
INTERNATIONAL JOURNALOF
Chapter 11
The building model is a detailed design expressing the intent
Table 2. Summary of Responses and Response Rates
PerceptionsaboutDesignforConstructionWorkerSafety:
PerceptionsaboutDesignforConstructionWorkerSafety:
Table 1. Annual Incidence Rates for Fatal Accidents in the United States
PerceptionsaboutDesignforConstructionWorkerSafety:
construction ofaproject,influencesandaffects construction meth- the participants’ firm/organization and their work experience. The
Fig. 3. Support for designers and owners to be involved in construction worker safety
Fig. 3. Support for designers and owners to be involved in construction worker safety
more often than all the other groups of participants combined all other groups combined (p-value∼0.0; 95% CI¼2.64–5.81).
PerceptionsaboutDesignforConstructionWorkerSafety:
Table 2. Summary of Responses and Response Rates
Technical Note
Retaining structures
Influence of Project Type and Procurement Method on Rework
While it is widely recognized that additional costs due to
CHAPTER 1
Etemadi
Model of arrangement of final material depots for concave
The building model is a detailed design expressing the intent
The building model is a detailed design expressing the intent
CONSTRUCTION & ENGINEERING TOOLKIT
Construction insurance
CHAPTER 3
CHAPTER 3
Factors Influencing Construction Labor
Factors Influencing Construction Labor
CHAPTER 3
Construction insurance
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
CONSTRUCTION AND ERECTION WORKS ALL RISK
Activity Analysis for Direct-Work
CONSTRUCTION AND ERECTION WORKS ALL RISK
CONSTRUCTION AND ERECTION WORKS ALL RISK
CONSTRUCTION AND ERECTION WORKS ALL RISK
Downloaded form http://iranpaper.ir
Tero Vido® UG (limited) is a German manufacturer of geophysical measuring instruments
Tero Vido® UG (limited) is a German manufacturer of geophysical measuring instruments
Journal of Safety Research 41 (2010) 399–406
تولید ناب در کشتی سازی
JPMA-01684; No of Pages 12
Safety Science 79 (2015) 116–125
حسابداری مدیریتی-1
حسابداری مدیریتی-۲
Safety Science 79 (2015) 116–125
حسابداری مدیریتی-۳
حسابداری مدیریتی-۴
حسابداری مدیریتی-۵
حسابداری مدیریتی-۶
حسابداری مدیریتی-۷
حسابداری مدیریتی-۸
حسابداری مدیریتی-۹
Transport Policy 48 (2016) 60–66
Transport Policy 48 (2016) 60–66
مباحت آتش نشانی
BASF Construction Chemicals
International Journal of Lean Six Sigma
1. Introduction
Expert Systems with Applications 40 (2013) 6253–6257
1. Introduction
Expert Systems with Applications 40 (2013) 6253–6257
112 H. Priemus, B. Ale/Safety Science 48 (2010) 111–122
frame structures were developed during the 19th century in response
Lessons from Building a Persian Written Corpus: Peykare
Available online at www.sciencedirect.com
As the aim of organization project management is making commitment
Available online at www.sciencedirect.com
Civil and Environmental Research www.iiste.org
164
8.1 Recommended Qualifications, Expertise andResponsibilities for a System Development Team In order to collect the necessary data and apply the procedures of this
ARTICLE IN PRESS
ARTICLE IN PRESS
A taxonomy for construction terms in privatized-
A taxonomy for construction terms in privatized-
International Journal of Construction Management
The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014)
The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014)
The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014)
CONSTRUCTION ACCOUNTING
International Journal of Construction Management
Case Studies in Construction Materials 6 (2017) 1–7
prohect cost management
Alexandria Engineering Journal (2013) 53, 81–93
BARRIERS TO BUILDING AND
Journal of the Operational Research Society (2013) 64, 1091–1105 2013 Operational Research Society Ltd. All rights reserved. 0160-5682/13
Construction scheduling problems Construction scheduling is concerned with optimally sequencing
Construction scheduling problems Construction scheduling is concerned with optimally sequencing
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
Journal of Civil Engineering and Management
Journal of Civil Engineering and Management
Created in Master PDF Editor - Demo Version
Automation in Construction 29 (2013) 183–195
AutomationinConstruction45(2014)96–106
Case Study
each change in construction project caused by chain of uncertain
S e e d i s c u s s i o n s , s t a t s , a n d a u t h o r p r o f i l e s f o r t h i s p u b l i c a t i o n a t : h t t p s : / / w w w . r e s e a r c h g a t e . n e t / p u b l i c a t i o n / 2 2 8 4 6 9 1 1 6
THE EXPERIENCES OF MALAYSIA AND OTHER COUNTRIES
We can conclude with a very significant instance in which
S e e d i s c u s s i o n s , s t a t s , a n d a u t h o r p r o f i l e s f o r t h i s p u b l i c a t i o n a t : h t t p s : / / w w w . r e s e a r c h g a t e . n e t / p u b l i c a t i o n / 2 7 3 3 2 2 2 8 6
International Association of Engineering Insurers
International Association of Engineering Insurers
Country Analysis Report - Australia
(b) without plug causing large
9 Main applications of smart materials in the building sector
cover DG19.qxd 1/29/2004 4:09 PM Page 1
Building for Environmental and Economic Sustainability Technical Manual and User
Grilo 6/15/07 12:10 PM Page 5
Management and Innovation for a Sustainable Built Environment ISBN: 9789052693958
a tax that [Putin] wants you to pay.” Nonetheless, as the magnitude of the Sochi expenses escalated,
ARTICLE 1 CONSTRUCTION MANAGER’S RESPONSIBILITIES
Downloaded from Ketab.io, Sponsor: TBS.ir
INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING
ISSN: 2277-9655
Intermsofapplyingthesetypesofanalysistoconstruction,thelimitations
Intermsofapplyingthesetypesofanalysistoconstruction,thelimitations
Chapter 4
ABSTRACT Construction is an area of studywherein making decisionsadequately can
International Journal of Information Management 37 (2017) 455–472
Safety Science 91 (2017) 298–309
Available online at www.sciencedirect.com
Employee Relations
Journal of Civil Engineering and Management
Journal of Civil Engineering and Management
Q11ality n1anagen1ent - ! 9
Q11ality n1anagen1ent - ! 9
Q11ality n1anagen1ent - ! 9
. (2)
Chapter 3 Production process improvement Summary A process for continuously
Pak. J. Engg. & Appl. Sci. Vol. 3 Jul 2008 (p.33 – 46)
3.2 Sponsor
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
quality management system and documentation for scrutiny and allows external audits to be
Fewer steps, stages and linkages in the flow patterns
Journal of Civil Engineering and Management
Grant a long term lease or sell the site to the
Grant a long term lease or sell the site to the
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
The Boring Company
Building Information Modeling (BIM) for existing buildings – literature review
Sustainable Cities and Society 18 (2015) 95–107
U.S. Department of Transportation Publication No. FHWA-NHI-16-027
S e e d i s c u s s i o n s , s t a t s , a n d a u t h o r p r o f i l e s f o r t h i s p u b l i c a t i o n a t : h t t p s : / / w w w . r e s e a r c h g a t e . n e t / p u b l i c a t i o n / 2 2 5 3 3 6 5 1 4
th
Five habitable 3D printed concrete houses to be built in
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
DK037X_half-series-title 3/17/06 11:30 AM Page 1
Journal of Building Engineering 15 (2018) 102–108
This is a list with 35 modern buildings that were
This is a list with 35 modern buildings that were
02 MaterialsMaterials used for tunnel engineering should conform to
02 MaterialsMaterials used for tunnel engineering should conform to
01 ScopeWorks involved in this section include the construction
Urban Planning for Tehran,
01 ScopeWorks involved in this Section include construction of
Planning and Scheduling Highway Construction
Planning and Scheduling Highway Construction
Case Study
FAILURES AND DEFECTS IN THE BUILDING PROCESS –
Reliability Engineering and System Safety 105 (2012) 36–46
01_BIM_Project_Execution_Planning_Guide_V2.1_(one-sided) A Building Information Model (BIM) is “a digital representation of physical and functional characteristics
Research Design - 1
1420
Building Information Exchange
11
12
13
BUSINESS OPERATIONS AND BIM
BUSINESS OPERATIONS AND BIM
62
42
Practical Guide to Rock Tunneling This page intentionally left blank Practical Guide to Rock Tunneling
Available online at www.sciencedirect.com
Available online at www.sciencedirect.com
1 Waldo appears each day in a different location on
1 Waldo appears each day in a different location on
i
(https://blog.greencarrier.com)
(https://blog.greencarrier.com)
What is Early Contractor Involvement (ECI) and how does it work?
Normalized shear strength of trapezoidal corrugated steel web dominated by
Normalized shear strength of trapezoidal corrugated steel web dominated by
Normalized shear strength of trapezoidal corrugated steel web dominated by
International Journal of Engineering and Advanced Technology (IJEAT)
See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/303515360
Downloaded from https://iranpaper.ir
Additionally , Table 4 shows the average percentage of healthy workers on the project and the lowest
Additionally , Table 4 shows the average percentage of healthy workers on the project and the lowest
Additionally , Table 4 shows the average percentage of healthy workers on the project and the lowest
Additionally , Table 4 shows the average percentage of healthy workers on the project and the lowest
Hindawi
This page intentionally left blank Construction
Risk and Construction