iTrans.ir
سفارش ترجمه
خانه
راهنما
چگونه سفارش ترجمه دهیم
تماس با ما
ترجمه فوری
راهنمای استفاده از سایت
API
بیشتر...
پرسش و پاسخ
قیمت ترجمه
ثبت نام
ورود
021-66989400
021-66989500
0935-173-0404
نشانی و اطلاعات تماس
تگ contractors
جزئیات خدمات ترجمه در ترجمه تخصصی
planning
decision
umbrella company
HSE Educational Matris during the Year Row Educational Programs and
To bid or not to bid: a parametric solution
Critical Factors Determining Bid/No Bid
Empirical Framework for Making the Bid/No-Bid Decision
A neural network bid/no bid model: the case for
To bid or not to bid: a parametric solution
Critical Factors Determining Bid/No Bid
Empirical Framework for Making the Bid/No-Bid Decision
A neural network bid/no bid model: the case for
To bid or not to bid: a parametric solution
To bid or not to bid: a parametric solution
To bid or not to bid: a parametric solution
Critical Factors Determining Bid/No Bid
Empirical Framework for Making the Bid/No-Bid Decision
SARVAK AZAR ENGINEERING AND DEVElOPMENT COMPANY
SARVAK AZAR ENGINEERING AND DEVElOPMENT COMPANY
SARVAK AZAR ENGINEERING AND DEVELOPMENT Co.
SARVAK AZAR ENGINEERING AND DEVELOPMENT Co.
January 27, 2015 8(1)
Guide to Enactment
Available online at www.sciencedirect.com
Downloaded from Ketab.io, Sponsor: TBS.ir
Journal of Civil Engineering and Management
Journal of Civil Engineering and Management
Journal of Civil Engineering and Management