iTrans.ir
سفارش ترجمه
خانه
راهنما
چگونه سفارش ترجمه دهیم
تماس با ما
ترجمه فوری
راهنمای استفاده از سایت
API
بیشتر...
پرسش و پاسخ
قیمت ترجمه
ثبت نام
ورود
021-66989400
021-66989500
0935-173-0404
نشانی و اطلاعات تماس
تگ facility
جزئیات خدمات ترجمه در ترجمه تخصصی
work
work
–
Computers & Industrial Engineering 62 (2012) 703–707
System decomposition On the supposition that a speed or position
WHAT’S IN A NAME?
REMEDIAL IMPLEMENTATION ALTERNATIVE SELECTION
REMEDIAL IMPLEMENTATION ALTERNATIVE SELECTION
REMEDIAL IMPLEMENTATION ALTERNATIVE SELECTION
is the only country which saw a growing car sales
Send Orders of Reprints at reprints@benthamscience.net
مقاله
New Page 1 Page 1 of 12
Computers & Industrial Engineering 66 (2013) 95–103
1
Portugal P
Computers & Industrial Engineering 58 (2010) 529–534
European Journal of Operational Research 162 (2005) 4–29
sufficient city development Introduction Metropolitan areas surrounding Seoul have developed
Hierarchical Placement and Network Design Problems
J Intell Manuf (2012) 23:651–659
J Ind Eng Int (2014) 10:54
Available online at www.sciencedirect.com
Spectators Safety Awareness in Outdoor Stadium Facilities Abstract It is
4 The distribution centre as an assembly facility Having discussed
Explosion rocks nuclear power plant in New York An explosion
U.S. Department of Transportation
U.S. Department of Transportation
HOV lanes by paying a toll. The lanes are
HOV lanes by paying a toll. The lanes are
NFPA 1620
This NFPA document is made available for use subject to
Parking problem becomes one of major issues in the city
Parking problem becomes one of major issues in the city
European Journal of Operational Research 237 (2014) 590–605
European Journal of Operational Research 237 (2014) 590–605
DESALINA~ON
DESALINA~ON
Computers & Operations Research 65 (2016) 93–103
Computers & Operations Research 65 (2016) 93–103
Computers & Operations Research 65 (2016) 93–103
Computers & Operations Research 65 (2016) 93–103
European Journal of Operational Research 225 (2013) 21–35
Fig. 2. Existing and proposed nameplate generation capacities vs. produced electricity from coal and
Fig. 2. Existing and proposed nameplate generation capacities vs. produced electricity from coal and
Fig. 2. Existing and proposed nameplate generation capacities vs. produced electricity from coal and
Fig. 2. Existing and proposed nameplate generation capacities vs. produced electricity from coal and
Computers & Operations Research 65 (2016) 93–103
Facilities
Trench drains built in the landfill site function to expel
Computers & Operations Research 67 (2016) 143–154
WG X-Ray Vehicle Scanning Portal
1 Introduction
1 Introduction
1 Introduction
Guidance for Industry
The Role of Trust in Effective Knowledge
Contents lists available at
March 2016
March 2016
March 2016
Parent
Expert Systems with Applications 39 (2012) 3–13
Expert Systems with Applications 39 (2012) 3–13
Journal of Informatics and Mathematical Sciences
This article was downloaded by: [University of Tennessee, Knoxville]
Journal of Informatics and Mathematical Sciences
Journal of Informatics and Mathematical Sciences
Journal of Informatics and Mathematical Sciences
TRANSPORTATION SCIENCE
TRANSPORTATION SCIENCE
Author’s Accepted Manuscript
Author’s Accepted Manuscript
Author’s Accepted Manuscript
Author’s Accepted Manuscript
Author’s Accepted Manuscript
it is desired to have a single mobile terminal for
You are so much better off if you know your
4698 L. García-Hernández et al./Expert Systems with Applications 42 (2015) 4697–4708
4698 L. García-Hernández et al./Expert Systems with Applications 42 (2015) 4697–4708
ISSN (Online) 2393-8021
Computers,EnvironmentandUrbanSystems59(2016)220–230
Highway Capacity Manual 2010
EPC TemplateThis EPC contract contemplates that a single contractor
Those most at risk of abuse are over 75 years
Chapter 4
Copyright Warning & Restrictions
Transportation Research Part E 107 (2017) 38–59
Omega 45 (2014) 71–79
Locating mobile facilities in railway construction management Abstract The location
Locating mobile facilities in railway construction management
Locating mobile facilities in railway construction management abstract The location
Locating mobile facilities in railway construction management
Locating mobile facilities in railway construction management abstract The location
Locating mobile facilities in railway construction management
NFPA 1620
DRAFT
International Journal of Disaster Risk Reduction 24 (2017) 485–498
Engineering Management in Production and Services
See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/319251628
5 Reasons to Consider a Power Monitoring System A power
Computers & Operations Research 67 (2016) 143–154
capacity of the facility. An integer flow, representing the number of
were the first to state the unequal area FLP and
Chapter 1
Mathematical modeling and multi-start search simulated
Mathematical modeling and multi-start search simulated
11
Preface
Proceedings of the 41st International Conference on Computers & Industrial Engineering
Pesquisa Operacional (2022) 42: e261044 p.1-25
Pesquisa Operacional (2022) 42: e261044 p.1-25
Decision Science Letters 12 (2023) 69–88
1.What is the current status of the Factory?